Hospitals & Schools
British Columbia LEEDS Certified
The Junior School is a newly constructed LEEDS designated “green” building. The floor plans were designed in conjunction with input from the Vision 2008 Committee who spent
countless hours consulting and visiting other schools to determine what would best suit the
needs of Queen Margaret’s students. The result is a Junior School that retains many of the
comforts of a small school but with additions of larger classrooms and new specialized
classrooms which enhance the students learning experience. The 20,000 square foot Junior
School is an exciting milestone in the School’s evolution.
- Two Aermec AN1517HA Heat Pumps
- Heating and Cooling
- Super quiet
- Hydronic Heat
- Electric Heat
- Multiple Fan Coils
St.Lawrence the Martyr Church, Toronto
Aermec fan coils were installed and the existing radiator covers were reinstalled. All piping
was run in the existing basement pipe chase. Fan coils were hung at the ceiling in the banquet
hall utililizing the existing pipe chase as well. Two new condensing boilers replace the existing
natural gas boiler. The goal was met, no changes to the beautiful sanctuary, a system that was
quieter than opening the windows, both sanctuary and banquet hall could be cooled, higher
efficiency heating, and all within budget.
-
-
- 5 ,10, and 20 ton chillers along with 44 fan coils
phase converters
2 boilers
domestic hot water
- 5 ,10, and 20 ton chillers along with 44 fan coils
-
Conservatory of Music, SF
Whisper Quiet Aermec Fan Coils
Built in 1917 and completely renovated in 2006 with a design that has entirely maintained the historical facade, while bringing the use of all that current technology has to offer. The building includes classrooms, rehearsal rooms, offices and a large library, which has been tripled in size with respect to the previous one.
Three concert rooms, housing 450, 160 and 20 seats. The approximate cost of the project was 80 millions dollars. Aermec fan coils were selected based on their silent operation. Electronic heat elements of 1.5kW to 11.5kW were installed. Of the 179 fan coils, 1/3 are cased and the remaining 2/3 are ducted fan coils.